CHECKLISTGO-LIVE READINESSGLR-R-001

ERP Go-Live Readiness Checklist: 30-Control Master Workbook

Comprehensive evaluation checklist and phase gate evidence matrix to determine if technical, business, and operational cutover readiness has been achieved.

Version 1.0Formats: XLSXPublished Oct 2026

What This Helps You Decide

This checklist provides the executive steering committee and program directors with an objective, evidence-based framework to decide: Can the project demonstrate sufficient controlled evidence to support a Go-Live authorization without unmitigated critical risk?

For the complete step-by-step methodology and evidence standards behind these 30 controls, review the companion ERP Go-Live Readiness Framework Guide.

What Is Included

  • Governance & Decision Rights: Formal sign-off criteria for steering committee members, business process owners, regulatory compliance, and vendor delivery declarations (4 controls).
  • UAT & Testing Evidence: Core scenario execution rate thresholds, Sev-1/Sev-2 defect limits, regression verification, peak performance benchmarks, and integrated business simulation (5 controls).
  • Data Migration & Reconciliation: Master data hash reconciliations, General Ledger & subledger trial balances, open order conversions, and timed delta catch-up runbooks (4 controls).
  • Integration Readiness: End-to-end interface connectivity handshakes, external bank/EDI partner sign-offs, dead-letter queue error handling, and cutover activation sequence (4 controls).
  • Business & Operational Readiness: End-user training competency thresholds, user access SoD conflict audits, published SOP desktop guides, and business continuity fallback plans (4 controls).
  • Cutover Planning & Rehearsal: Master cutover runbook baselines, mock cutover dress rehearsal timing validation, technical Point of No Return (PONR) rollback protocol, and transport freeze controls (4 controls).
  • Hypercare & Support Readiness: 24/7 multi-tier support staffing schedules, daily war room defect triage cadences, and infrastructure monitoring alerting thresholds (3 controls).
  • Go/No-Go Decision Gate & Formal Approval: Structured Exception Risk Ledger, formula-backed readiness metrics, and formal executive authorization voting record (2 controls).

How To Use It

  1. Adapt Governance Terminology: Customize the control categories and named owners to match your enterprise organization.
  2. Assign Control Owners: Designate specific lead consultants and business leads for each readiness domain.
  3. Attach Verified Evidence: Replace subjective “green” status reports with attached audit artifacts, transport logs, and signed reconciliation sheets.
  4. Evaluate Exception Risks: Record any unresolved defect or open item alongside an approved operational workaround.
  5. Convene Executive Gate Review: Present the completed evidence package to the Go/No-Go steering committee alongside the Master Cutover Plan.

Interactive Evaluation Tool: Prefer calculating your readiness score in real-time? Use the ERP Go-Live Readiness Score Calculator to model all 30 controls locally in your browser with zero server data transmission.

Adaptation Note: This checklist should be adapted to the specific scope, risk profile, regulatory context, and governance model of your ERP program.

Structured Artifact Preview

STRUCTURED HTML PREVIEWRepresentative rows from source workbook specification
Go-Live Readiness Control Matrix Preview
ControlEvidence RequiredOwnerStatusRisk Exposure
Defect Severity ThresholdDefect repository export confirming zero open Sev-1/Sev-2 itemsQA LeadVERIFIEDUnmitigated transaction blockage
Financial Balance ReconciliationGeneral Ledger & Subledger balance match sign-off recordFinance LeadRECONCILEDFinancial reporting misstatement
User Access & SoD Audit100% user role assignment audit against Segregation of Duties matrixSecurity Administrator98% COMPLETEUnauthorized access rights exposure
Disaster Recovery Dry RunRTO/RPO snapshot backup and recovery test verification logBasis LeadTESTEDExtended system downtime during outage
Hypercare Support Roster24/7 Level 1-3 support staffing schedule across operational shiftsService Desk ManagerNOT ASSESSEDDelayed incident resolution post-go-live
CONTROLLED ASSETPractitioner Email Delivery

Request Gated Resource Access

The ERP Go-Live Readiness Checklist: 30-Control Master Workbook is a restricted delivery artifact. Submit your enterprise work email below to receive the XLSX package directly via automated transactional dispatch.

Form to request delivery of gated ERP readiness checklist.

The workbook artifact will be dispatched directly to this address.

We respect enterprise confidentiality. Zero commercial trackers. Review ourPrivacy Policy for data handling practices.
AUTHORITATIVE SOURCES & CITATIONSLEVEL-1-OFFICIAL
EDITORIAL METHODOLOGY & EVIDENCE TIER
Level 1: Official & Documented

Technical specifications grounded in primary vendor documentation or formal industry standards.

The 30-control master workbook synthesizes transition controls from ISO/IEC/IEEE 24748-1, audit compliance mandates from PCAOB AS 2201, and change acceptance gates from COBIT 2019.

YOUR NEXT DECISION

Transition from resource execution to ERP UAT Exit Criteria: Governance, Defect Tolerances & Sign-Off.