GLR-T-001DECISION SUPPORT TOOL100% CLIENT-SIDE

ERP Go-Live Readiness Score Calculator

An interactive, evidence-gated decision assessment evaluating your program across 30 authoritative controls in 8 core ERP domains. Separates assessment coverage from verified audit readiness, identifies active cutover blockers, and calculates an objective Steering Committee advisory.

COMPANION ARTIFACT:Based directly on the authoritative ERP Go-Live Readiness Checklist v1.0 (GLR-R-001) workbook framework.
100% Client-Side Decision Tool: Your assessment responses, evidence notes, and scores are processed entirely inside your local browser. Zero evaluation data is transmitted to our servers or third-party tracking services.
STEERING COMMITTEE ADVISORY
NO-GO ADVISORY

Mandatory cutover controls have not been evaluated with objective evidence.

ASSESSMENT COVERAGEEvaluated / Scope
0%0 / 30
VERIFIED READINESSAudit Verified
0%0 / 30
ACTIVE BLOCKERSGate Blockers
15Critical

Zero Critical blockers required for cutover.

Active Cutover Blockers Register (0)

The following mandatory controls must be resolved or formally mitigated before the Executive Steering Committee can authorize go-live.

DOMAIN 01 OF 08

Governance & Decision Rights

Executive authority, stakeholder sign-offs, statutory concurrence, and SI commitments.

4 Controls
GLR-CTL-GOV-01CRITICALOwner: Program Director
Guide: Steering Committee Go / No-Go Decision Framework โ†’

Steering Committee Sign-Off & Authority

Has the executive steering committee established formal decision rights and approved the gate criteria for cutover authorization?

ACCEPTANCE CRITERIA:Executed steering committee charter and formal cutover gate criteria document signed by executive sponsors.
REQUIRED EVIDENCE:Signed executive gate charter and committee meeting minutes approving gate entry.
DECISION RISK:Inability to convene decision committee or lack of delegated authority halts cutover authorization.
GLR-CTL-GOV-02CRITICALOwner: Business Transformation Lead
Guide: ERP Go-Live Readiness โ†’

Business Process Owner (BPO) Formal Sign-Off

Have all designated Business Process Owners formally approved their functional stream readiness for production operations?

ACCEPTANCE CRITERIA:100% formal written sign-offs received from Finance, Supply Chain, Operations, and Sales BPOs.
REQUIRED EVIDENCE:Signed functional stream readiness declarations from each named BPO.
DECISION RISK:Unapproved functional area requires formal exception waiver or forces NO-GO.
GLR-CTL-GOV-03CRITICALOwner: Compliance & Internal Audit Lead
Guide: ERP Go-Live Readiness โ†’

Regulatory, Compliance & Audit Concurrence

Have internal audit, statutory compliance, and data privacy officers confirmed regulatory compliance controls?

ACCEPTANCE CRITERIA:Documented review confirming SOX, GDPR/privacy, and local statutory tax compliance controls are verified.
REQUIRED EVIDENCE:Audit & Compliance concurrence memorandum with zero unresolved statutory objections.
DECISION RISK:Statutory non-compliance exposes enterprise to regulatory shutdown; mandatory NO-GO if unresolved.
GLR-CTL-GOV-04HIGHOwner: Commercial / Vendor Manager
Guide: Steering Committee Go / No-Go Decision Framework โ†’

SI & Vendor Contractual Readiness Confirmation

Have the System Integrator (SI) and key software vendors submitted formal contractual delivery declarations?

ACCEPTANCE CRITERIA:Written delivery acceptance and go-live endorsement from System Integrator leadership.
REQUIRED EVIDENCE:Executed SI delivery completion statement and vendor support coverage confirmation.
DECISION RISK:Vendor dispute or unresolved delivery contention requires commercial resolution before cutover.
DOMAIN 02 OF 08

UAT & Testing Evidence

Scenario execution rates, defect thresholds, regression verification, and performance benchmarks.

5 Controls
GLR-CTL-UAT-01CRITICALOwner: Test Manager / QA Lead
Guide: ERP UAT Exit Criteria โ†’

Core Business Scenario Execution Rate

Were 100% of planned critical and high-priority end-to-end business process scenarios executed in UAT?

ACCEPTANCE CRITERIA:Test management export confirming 100% execution of high/critical scripts and >= 95% overall execution.
REQUIRED EVIDENCE:Test management suite (e.g., ALM/Jira) execution report signed by QA Lead.
DECISION RISK:Unexecuted core business workflows represent unquantified operational failure risk.
GLR-CTL-UAT-02CRITICALOwner: QA Lead / Defect Manager
Guide: ERP Defect Severity Classification & Daily Triage โ†’

Critical & High Defect Exit Threshold (Sev-1 & Sev-2)

Are all critical (Sev-1) and high (Sev-2) defects resolved, or mitigated by approved business workarounds?

ACCEPTANCE CRITERIA:Zero open Sev-1 defects; zero open Sev-2 defects without signed BPO temporary workaround agreement.
REQUIRED EVIDENCE:Defect repository status export and signed workaround log for any open Sev-2 exception.
DECISION RISK:Open Sev-1 defect is an automatic NO-GO; unapproved Sev-2 blocks entry.
GLR-CTL-UAT-03HIGHOwner: Test Manager
Guide: ERP UAT Exit Criteria โ†’

Regression & Defect Re-test Verification

Have all defect fixes undergone verified regression testing without introducing secondary business process breaks?

ACCEPTANCE CRITERIA:Regression test cycle executed with 100% pass rate on impacted functional touchpoints.
REQUIRED EVIDENCE:Regression test summary report and defect re-test verification log.
DECISION RISK:Risk of undetected collateral defect propagation into live business transactions.
GLR-CTL-UAT-04HIGHOwner: Technical Architect / Basis Lead
Guide: SAP S/4HANA Go-Live Readiness Framework โ†’

Performance & Technical Volume Benchmark Testing

Has the production-like environment demonstrated acceptable transaction response times under peak peak-hour loads?

ACCEPTANCE CRITERIA:Peak-load performance test results meeting agreed SLA response time thresholds for key transactions.
REQUIRED EVIDENCE:Technical performance test results report with database and server resource utilization metrics.
DECISION RISK:System throughput degradation under live operational volume leads to business stall.
GLR-CTL-UAT-05HIGHOwner: Business Integration Lead
Guide: ERP Cutover Dress Rehearsal Validation โ†’

Day-in-the-Life / Cross-Functional Integrated Simulation

Was an end-to-end cross-functional business simulation executed to validate cross-module handoffs?

ACCEPTANCE CRITERIA:Successful execution of multi-day integrated simulation covering order-to-cash, procure-to-pay, and record-to-report.
REQUIRED EVIDENCE:Signed Day-in-the-Life simulation outcome report with cross-functional BPO approvals.
DECISION RISK:Functional silo readiness does not guarantee end-to-end operational viability.
DOMAIN 03 OF 08

Data Migration & Reconciliation

Master data cleansing, trial balance reconciliation, open orders, and delta catch-up.

4 Controls
GLR-CTL-DAT-01CRITICALOwner: Data Migration Lead
Guide: SAP S/4HANA Go-Live Readiness Framework โ†’

Master Data Cleansing, Transformation & Hash Reconciliation

Have all production master data entities (Customer, Vendor, Material, Chart of Accounts) reconciled 100% against legacy extracts?

ACCEPTANCE CRITERIA:100% record count match and automated field-level hash/checksum validation for key master data objects.
REQUIRED EVIDENCE:Master data load audit report with legacy source vs target extract reconciliation counts.
DECISION RISK:Corrupt or missing master data prevents downstream transactional posting across all modules.
GLR-CTL-DAT-02CRITICALOwner: Finance Director / CFO Delegate
Guide: ERP Go-Live Readiness โ†’

General Ledger & Subledger Financial Balance Reconciliation

Do opening General Ledger balances and Subledger open items reconcile exactly to the signed legacy trial balance?

ACCEPTANCE CRITERIA:Zero unexplained variance between legacy trial balance and target system opening trial balance.
REQUIRED EVIDENCE:Signed financial reconciliation packet including GL, AP, AR, and Asset Accounting balance sheets.
DECISION RISK:Financial balance imbalance causes immediate statutory reporting failure; mandatory NO-GO.
GLR-CTL-DAT-03CRITICALOwner: Supply Chain Migration Lead
Guide: ERP Cutover Plan Structure โ†’

Open Transactional Items Reconciliation (Sales, Purchase & Work Orders)

Have open purchase orders, sales backlog, and inventory balances reconciled accurately with documented cutover conversions?

ACCEPTANCE CRITERIA:100% reconciliation of open PO quantities/values and open SO backlog against agreed cutover conversion rules.
REQUIRED EVIDENCE:Open order reconciliation certificate signed by Supply Chain and Sales operations leads.
DECISION RISK:Missing or duplicated transactional items cause shipment stoppages and invoicing errors.
GLR-CTL-DAT-04HIGHOwner: Data Migration Lead
Guide: ERP Cutover Dress Rehearsal Validation โ†’

Data Blackout & Delta Catch-Up Runbook Verification

Is the sequence and timing for legacy system transaction freeze and delta data capture fully verified and tested?

ACCEPTANCE CRITERIA:Delta migration scripts tested during mock cutover with confirmed processing times within the cutover window.
REQUIRED EVIDENCE:Delta load execution logs and timed catch-up procedure document from mock cutover.
DECISION RISK:Extended delta loads cause cutover window breach and delayed business resumption.
DOMAIN 04 OF 08

Integration Readiness

Interface connectivity, external bank/EDI verification, queue error handling, and sequencing.

4 Controls
GLR-CTL-INT-01CRITICALOwner: Integration Architect
Guide: SAP S/4HANA Go-Live Readiness Framework โ†’

End-to-End Interface Connectivity & Authentication

Are all production middleware channels, API endpoints, and direct interfaces configured and connectivity-verified?

ACCEPTANCE CRITERIA:100% green ping and mutual TLS / credential handshake verification across all inbound and outbound interface endpoints.
REQUIRED EVIDENCE:Interface connectivity inventory matrix with timestamped connection logs.
DECISION RISK:Disconnected interfaces cause immediate operational isolation of the core ERP.
GLR-CTL-INT-02CRITICALOwner: B2B / EDI Lead
Guide: ERP Go-Live Readiness โ†’

Third-Party & External Partner Validation (Banks, EDI, Logistics)

Have external financial institutions, EDI trading partners, and 3PL carriers validated production communication and file formats?

ACCEPTANCE CRITERIA:Formal confirmation of successful pre-production file exchange from all critical banks, customers, and carriers.
REQUIRED EVIDENCE:Partner acknowledgment sign-offs, test bank payment acknowledgment, and EDI validation certificates.
DECISION RISK:Banking payment transmission failures or 3PL warehouse messaging breaks disrupt cash flow and physical delivery.
GLR-CTL-INT-03HIGHOwner: Middleware Lead
Guide: ERP Cutover Plan Structure โ†’

Middleware Queue Error Handling & Dead-Letter Recovery

Have asynchronous message queue error handling, alerting thresholds, and replay mechanisms been validated?

ACCEPTANCE CRITERIA:Automated alerts configured for failed interface messages; documented and tested manual replay procedure.
REQUIRED EVIDENCE:Interface error handling standard operating procedure (SOP) and alert test verification log.
DECISION RISK:Unhandled message drops cause silent data loss between distributed enterprise applications.
GLR-CTL-INT-04HIGHOwner: Integration Lead
Guide: ERP Cutover Dress Rehearsal Validation โ†’

Interface Sequence & Dependency Timing in Cutover

Is the activation order of interfaces (pre-cutover freeze, cutover blackout, post-cutover unlock) aligned with data loading?

ACCEPTANCE CRITERIA:Detailed interface sequencing table integrated into master cutover runbook with identified trigger points.
REQUIRED EVIDENCE:Interface cutover schedule and dependency matrix cross-referenced with cutover runbook.
DECISION RISK:Premature interface activation causes inbound transactional traffic before master data loads complete.
DOMAIN 05 OF 08

Business & Operational Readiness

End-user training thresholds, role provisioning, SoD audit, SOP publication, and BCP fallback.

4 Controls
GLR-CTL-BUS-01CRITICALOwner: Organizational Change Management (OCM) Lead
Guide: ERP & SAP Business Readiness Assessment โ†’

End-User Training Completion & Competency Thresholds

Have targeted business users completed mandatory role-based training and demonstrated system competency?

ACCEPTANCE CRITERIA:>= 95% training attendance for core transaction roles; 100% completion for critical financial/operational authorizers.
REQUIRED EVIDENCE:Learning management system (LMS) completion report signed by Change Management Lead.
DECISION RISK:Untrained users submit malformed transactions, causing operational backlog and business paralysis.
GLR-CTL-BUS-02CRITICALOwner: Security & Authorization Lead
Guide: SAP S/4HANA Go-Live Readiness Framework โ†’

User Access Role Provisioning & Segregation of Duties (SoD) Audit

Are 100% of user production access accounts provisioned with zero unapproved Segregation of Duties conflicts?

ACCEPTANCE CRITERIA:User role assignments audited against GRC / SoD matrix; zero unmitigated toxic role combinations.
REQUIRED EVIDENCE:Production security role assignment report and signed SoD exception waiver document.
DECISION RISK:Users unable to log in on Day 1, or critical compliance violations introduced into production.
GLR-CTL-BUS-03MEDIUMOwner: Business Process Lead
Guide: ERP & SAP Business Readiness Assessment โ†’

Standard Operating Procedures (SOPs) & Desktop Guides

Are updated business process SOPs and step-by-step desktop guides published and accessible to all operational staff?

ACCEPTANCE CRITERIA:100% of core SOPs approved by BPOs and published in enterprise knowledge repository.
REQUIRED EVIDENCE:SOP inventory register with publication links and BPO verification timestamps.
DECISION RISK:Staff lack procedural guidance for exceptions, slowing day-to-day transaction processing.
GLR-CTL-BUS-04HIGHOwner: Business Operations Lead
Guide: ERP & SAP Business Readiness Assessment โ†’

Business Continuity & Operational Fallback Contingency

Are interim manual business procedures documented for essential business processes if technical issues arise?

ACCEPTANCE CRITERIA:Approved manual fallback plans for emergency order entry, manual goods dispatch, and payroll processing.
REQUIRED EVIDENCE:Business Continuity Plan (BCP) addendum signed by Operations Director.
DECISION RISK:Absence of fallback plans turns temporary technical hiccups into total operational stoppages.
DOMAIN 06 OF 08

Cutover Planning & Rehearsal

Master runbook baselines, full mock cutovers, Point of No Return (PONR), and transport freeze.

4 Controls
GLR-CTL-CUT-01CRITICALOwner: Cutover Manager
Guide: ERP Cutover Plan Structure โ†’

Master Cutover Runbook Completeness & Single Ownership

Does the detailed cutover schedule identify task durations, exact dependencies, and a single named owner per task?

ACCEPTANCE CRITERIA:Master cutover runbook baseline locked with 100% named task owners and verified predecessor linkages.
REQUIRED EVIDENCE:Baselined Master Cutover Plan export with schedule sign-off from all stream leads.
DECISION RISK:Ambiguous ownership or circular dependencies cause cutover coordination failure.
GLR-CTL-CUT-02CRITICALOwner: Cutover Manager
Guide: ERP Cutover Dress Rehearsal Validation โ†’

Full Mock Cutover (Dress Rehearsal) Execution & Timing Validation

Did at least one full mock cutover execute successfully within the planned production cutover window?

ACCEPTANCE CRITERIA:Mock cutover completed with actual task duration variances within 10% of planned outage window.
REQUIRED EVIDENCE:Mock Cutover dress rehearsal report with scheduled vs actual task duration analysis.
DECISION RISK:Unvalidated timings lead to cutover window overrun and delayed business startup.
GLR-CTL-CUT-03CRITICALOwner: Program Director & Technical Lead
Guide: ERP Cutover Plan Structure โ†’

Point of No Return (PONR) & Technical Rollback Plan

Has the technical Point of No Return been explicitly defined with a documented, tested legacy rollback procedure?

ACCEPTANCE CRITERIA:Rollback runbook verified; explicit criteria and timeline for abort decision established prior to PONR.
REQUIRED EVIDENCE:Signed Rollback & Abort Protocol document with defined PONR milestone and step-by-step restoration tasks.
DECISION RISK:Inability to execute safe abort leaves enterprise with non-functional production system and corrupt legacy state.
GLR-CTL-CUT-04CRITICALOwner: Basis / Technical Infrastructure Lead
Guide: SAP S/4HANA Go-Live Readiness Framework โ†’

Technical Transport Freeze & Environment Parity

Has production environment configuration, parameter sizing, and transport freeze been enforced and locked?

ACCEPTANCE CRITERIA:Transport system locked 72h prior to cutover; DB and OS parameters verified 100% identical to staging baseline.
REQUIRED EVIDENCE:Basis environment parity verification audit report and transport freeze change management log.
DECISION RISK:Untracked changes or parameter drift cause unpredicted production system crashes during cutover.
DOMAIN 07 OF 08

Hypercare & Support Readiness

24/7 support roster, daily defect triage cadence, war room, and monitoring alert systems.

3 Controls
GLR-CTL-HYP-01CRITICALOwner: Hypercare / Service Desk Lead
Guide: ERP Go-Live Readiness โ†’

24/7 Multi-Tier Hypercare Support Organization & Roster

Is a designated Level 1, 2, and 3 support organization staffed and scheduled across all operational shifts and timezones?

ACCEPTANCE CRITERIA:100% of support shifts staffed with named functional and technical consultants for the first 30 days post go-live.
REQUIRED EVIDENCE:Hypercare staffing roster with contact details, shift rotations, and vendor escalation paths.
DECISION RISK:Incident response bottlenecks create immediate operational frustration and business backlog.
GLR-CTL-HYP-02HIGHOwner: Service Delivery Manager
Guide: ERP Defect Severity Classification & Daily Triage โ†’

Incident Triage Cadence, War Room & Escalation Governance

Are daily defect triage meetings, executive war room facilities, and priority escalation workflows established?

ACCEPTANCE CRITERIA:Daily triage cadence scheduled; dedicated physical/virtual war room active; incident priority matrix agreed.
REQUIRED EVIDENCE:Hypercare governance charter with meeting schedules, incident SLA targets, and escalation hierarchy.
DECISION RISK:Unclear escalation paths delay resolution of high-priority operational defects.
GLR-CTL-HYP-03HIGHOwner: IT Operations / Basis Lead
Guide: SAP S/4HANA Go-Live Readiness Framework โ†’

Technical Infrastructure Monitoring & Alerting Readiness

Are production server health, database thresholds, interface queues, and batch job monitors active with 24/7 alerts?

ACCEPTANCE CRITERIA:APM / monitoring tools active with configured alerting thresholds for CPU, memory, tablespace, and batch aborts.
REQUIRED EVIDENCE:Monitoring tool configuration report and incident alert test run confirmation.
DECISION RISK:Silent infrastructure failures go undetected until business users report corrupted or halted transactions.
DOMAIN 08 OF 08

Go/No-Go Decision Evidence & Approval

Pre-cutover exception risk ledger and formal executive committee voting authorization.

2 Controls
GLR-CTL-DCN-01CRITICALOwner: Program Director & QA Lead
Guide: Steering Committee Go / No-Go Decision Framework โ†’

Pre-Cutover Gate Assessment & Exception Risk Ledger

Have all 28 operational controls been assessed with objective evidence, and are all exceptions approved in the Risk Ledger?

ACCEPTANCE CRITERIA:Zero controls in NOT_ASSESSED status; 100% of exceptions documented with named accountability and approved workarounds.
REQUIRED EVIDENCE:Completed Readiness Assessment and signed Exception Risk Ledger.
DECISION RISK:Unassessed controls or hidden risks undermine the validity of the executive Go/No-Go decision.
GLR-CTL-DCN-02CRITICALOwner: Executive Steering Committee
Guide: Steering Committee Go / No-Go Decision Framework โ†’

Executive Committee Formal Go/No-Go Authorization

Has the executive steering committee formally voted and executed the written Go/No-Go decision authorization record?

ACCEPTANCE CRITERIA:Unanimous or quorum sign-off from Executive Sponsor, CFO, COO, CIO, and SI Executive Sponsor on decision record.
REQUIRED EVIDENCE:Executed Go/No-Go Decision Record with physical/digital signatures and gate meeting minutes.
DECISION RISK:Authorizing cutover without formal executive governance exposes program leadership to unshielded business liability.
DECISION GOVERNANCE

Assessment Methodology & Scoring Principles

1. Coverage vs. Verified Readiness

Traditional project dashboards often report a single misleading "green" percentage based on task completion. This calculator strictly separates Assessment Coverage (whether a control has been evaluated) from Evidence-Verified Readiness (whether the checkpoint has objective audit artifacts verified by stream owners).

2. The Zero Critical Blocker Rule

A 95% readiness score does not permit cutover if a single Critical control (such as general ledger opening trial balance reconciliation or disaster recovery rollback) is unverified. Any Critical control not marked Evidence Verified strictly forces a NO-GO ADVISORY.

3. Documented Exceptions & Waivers

A CONDITIONAL GO advisory is only generated when 100% of Critical controls are verified and remaining High-priority open items have formal business process owner sign-off and documented operational workarounds recorded in an Exception Risk Ledger.

4. Human Authority & Steering Governance

This calculator provides evidence-based decision intelligence. It is not an automated authorization to execute cutover. Go-live authority resides exclusively with the executive project sponsor and voting members of the Executive Steering Committee.

CALCULATION DETAILS

How Is the ERP Go-Live Readiness Score Calculated?

These thresholds are tool-specific policies. Final go-live authorization belongs to the Steering Committee.

Assessment Coverage

Formula: assessed applicable controls / total applicable controls × 100

Only valid Not Applicable exclusions are removed from the denominator.

Evidence-Verified Readiness

Formula: evidence-verified controls / total applicable controls × 100

Assessment coverage and evidence-verified readiness are separate, unweighted percentages. A Not Applicable justification requires at least 10 characters.

Worked Example

With 30 total controls and 2 valid exclusions, there are 28 applicable controls. With 25 assessed controls and 22 evidence-verified controls, coverage is 89% (25 / 28 × 100) and verified readiness is 79% (22 / 28 × 100). Results are rounded to whole percentages.

Decision Gates

  • Critical blocker present → NO-GO.
  • Otherwise, coverage below 85% or verified readiness below 75% → DEFER.
  • Otherwise, verified readiness below 95% or High blockers present → CONDITIONAL GO.
  • Otherwise → GO ADVISORY.
PLATFORM CAPABILITIES

Unified ERP Go-Live Decision Platform Architecture (GLR-10)

Beyond isolated checklist evaluations, Get Go-Live Ready provides a continuous, source-grounded decision infrastructure integrating cross-stream governance, evidence verification, and cutover synchronizations.

GLR-10A: Unified Readiness Dashboard

Aggregates readiness scoring, UAT pass rates, cutover rehearsal buffer headroom, open Sev-1/2 defect counts, and active critical risks into a single executive Program Health Index and SteerCo Go/No-Go advisory.

GLR-10B: Go-Live Decision Advisor โ€” Evidence-Based

Deterministic, rule-driven query engine grounded strictly in verified practitioner guides (GLR-G-001 through GLR-G-025). Provides explainable recommendations with verified citations and zero hallucination risk, maintaining human SteerCo authority.

GLR-10C: Continuous Risk & Issue Register

Continuous 5x5 Likelihood x Impact operational risk scoring. Features residual risk mitigation tracking, critical risk blocker escalation (severity ≥ 20), and cycle detection preventing circular blocker deadlocks.

GLR-10D: Cutover Timeline Synchronizer

Synchronizes cutover task predecessor chains using Directed Acyclic Graph (DAG) dependency logic. Calculates zero-slack critical paths and monitors 72-hour weekend blackout window thresholds.

GLR-10E: Local Project Workspace & Privacy

Ensures zero assessment data transmission to external servers. Supports local-first project persistence and export/import via tamper-evident .glrproj bundles verified with SHA-256 cryptographic hashes.

GLR-10F: Industry Benchmark Intelligence

Enables empirical cohort comparisons against verified enterprise implementations (SAP S/4HANA Manufacturing, Retail, Financials, Oracle Fusion, Microsoft Dynamics 365) and tracks self-comparison milestone velocity.

GLR-10G: Continuous Assurance & Rehearsals

Continuously monitors control drift, evidence artifact expiration, and blocker aging. Enforces multi-rehearsal variance tracking and mandatory technical rollback drill verification.

EXECUTIVE BRIEFING & DEFINITION

Executive Summary & Decision Purpose

The ERP Go-Live Readiness Score Calculator evaluates enterprise delivery programs across 30 controls in 8 domains. It enforces a Zero Critical Blocker rule: if any critical control (such as general ledger opening balances or rollback recovery) is unverified, the engine issues an unconditional NO-GO advisory regardless of a high overall score.

Who Should Use This Tool

  • ERP Program Directors
  • Project Managers (PMO)
  • Executive Steering Committee Members
  • Cutover Managers
  • SAP Delivery Leads

When to Use in ERP Lifecycle

Recommended Timing: Phase Gates (T-90, T-60, T-30, T-14, T-0 Cutover)

Integrate results into formal phase-gate deliverables, weekly program steering checkpoints, or the final 48-hour cutover countdown meeting.

Required Inputs & Data Format

  • 30 control evaluations (Evidence Verified, Evidence Missing, In Progress, N/A)
  • Domain weighting percentages (default or custom normalized to 100%)
  • Critical blocker flags and exception justification notes

๐Ÿ”’ All inputs remain in local browser memory. Zero assessment data is transmitted to external servers.

Outputs, Metrics & Decisions

  • Assessment Coverage percentage (assessed / applicable * 100)
  • Evidence-Verified Readiness score (verified / applicable * 100)
  • Steering Committee Advisory Verdict (GO, CONDITIONAL GO, DEFER, NO-GO)
  • Active Critical Blockers register and prioritized action backlog
  • Client-side executive PDF report
PRACTICAL WORKED EXAMPLE

Global SAP S/4HANA Manufacturing Program (30-Control Assessment)

Scenario: A multi-plant enterprise is 14 days from scheduled cutover. Delivery streams have evaluated 29 of 30 controls (1 excluded plant is marked Not Applicable). 26 controls are Evidence Verified, 2 are in progress, and 1 Critical control (DAT-02 Trial Balance Zero Delta) is unverified.

Evaluation Sequence:

  1. Assessment Coverage: 29 assessed / 29 applicable controls = 100% assessment coverage.
  2. Evidence-Verified Readiness: 26 verified / 29 applicable controls = 90% unweighted readiness score.
  3. Domain Weighting: Applying standard domain weights (Data 15%, Business 15%, Cutover 15%, Testing 15%, etc.) yields an 89.5% weighted score.
  4. Critical Blocker Verification: Control DAT-02 (General Ledger Opening Balance Tie-out) is classified Critical and is currently Evidence Missing.
  5. Safeguard Veto: Despite an 89.5% weighted score, the Zero Critical Blocker rule overrides percentage thresholds and prevents a conditional go.
Governance Result:

NO-GO ADVISORY. The system halts cutover approval due to unverified financial trial balance clearing. Remediation actions are prioritized in the action queue for immediate finance data lead execution.

FREQUENTLY ASKED QUESTIONS

Frequently Asked Questions About Readiness Calculator

How does the ERP Go-Live Readiness Score Calculator prevent high scores from masking critical blockers?

The calculator enforces a Zero Critical Blocker safeguard: if any critical control (such as general ledger trial balance reconciliation, disaster recovery rollback, or open Sev-1 defect resolution) is unverified, the calculator strictly issues a NO-GO advisory regardless of overall percentage scores.

What is the difference between assessment coverage and evidence-verified readiness?

Assessment coverage measures the percentage of applicable controls that have been evaluated by delivery teams. Evidence-verified readiness measures the percentage of controls backed by verified audit artifacts signed off by accountable stream leads. The two metrics are tracked separately to prevent false confidence.

What capabilities are included in the Unified Decision Platform (GLR-10)?

The Unified Decision Platform incorporates the 30-Control Readiness Calculator (GLR-09A), the Unified Readiness Dashboard (GLR-10A), the Evidence-Based Go-Live Decision Advisor (GLR-10B), the Continuous Risk Register (GLR-10C), Cutover Schedule Synchronization (GLR-10D), Local .glrproj Workspace (GLR-10E), Industry Benchmark Intelligence (GLR-10F), and Continuous Assurance (GLR-10G).

How does the Go-Live Decision Advisor generate recommendations?

The advisor is a deterministic, rule-based recommendation engine grounded strictly in verified practitioner implementation guides. It classifies query intent and retrieves explainable guidance with exact guide citations, eliminating hallucination risks while leaving decision authority with the Steering Committee.

Is any assessment or project data transmitted to external cloud servers?

No. All calculations, scoring algorithms, advisor queries, risk registers, and PDF generation execute 100% locally in the user web browser memory. Project files use the tamper-evident .glrproj format with SHA-256 integrity validation and zero cloud data transmission.

Non-Binding Decision Support Notice & Human Steering Authority

This tool provides objective analytical models, deterministic calculations, and evidence-based decision guidance. It does not replace the formal voting procedures, fiduciary responsibilities, or risk authorizations of the project sponsor and Executive Steering Committee.

Framework: GLR Decision Assurance StandardPeer Reviewed by SAP Delivery LeadershipUpdated: Q4 2026